Skip to content →

Passing the CSI Inspection Protocol Tuesday, Aug. 13

The design of your solar system, as well as shading issues, affects the production of your solar system and thereby the CSI rebate amount you will receive.

For quality assurance, the accuracy of incentive payouts as specified on the EPBB calculator is verified through onsite inspections for randomly selected projects.

Come learn about the relationship of azimuth and tilt, how to handle oddly shaped arrays (non-geometric figures), CSI inspection protocol guidelines and much more.

August 13, 2013 3:00 PM   through   4:00 PM

9325 Sky Park Court
Suite #100
San Diego, CA 92123-4368
United States
Phone: 858-244-1177
Email: events@energycenter.org

Published in SDG&E Green Academy Training